GAZ-SYSTEM S.A., the gas transmission operator, has obtained funding for the ‘Construction of the Lwówek Gas Compressor Station’ project from the European Funds for Infrastructure, Climate and Environment 2021–2027 programme.

Basic parameters and description of the investment:
The following scope of work will be carried out as part of the investment:

  • construction of a gas compressor station equipped with three compressor units with a total capacity of 24 MW,
  • construction of a bidirectional regulation and metering station enabling gas transmission between the National Transmission Network (KSP) and the Transit Gas Pipeline System (SGT) in Zębowo (2 x 1,600,000 m3/h),
  • construction of two DN1000 connection gas pipelines with a length of approx. 300 m, connecting the Lwówek Gas Compressor Station with the Zębowo Valve and Relief Unit,
  • construction of medium-voltage power connections with a total length of approx. 15 km.


Objectives and effects of the investment:

  • The construction of the Lwówek Gas Compressor Station is being carried out as part of the SGT Programme, which aims to increase the integration of the National Gas Transmission System with the Polish section of the Transit Gas Pipeline System.
  • The direct objective of the compressor station construction is to create a connection between the SGT and the KSP in the vicinity of the Lwówek Junction, i.e. the place where the Baltic Pipe gas pipeline ends and the North-South Corridor gas pipelines begin.
  • The construction of the compressor station, combined with the expansion of the Lwówek node, will thus increase the number of gas transmission directions using the SGT infrastructure.


The investment will bring the following benefits:

  • Increased efficiency of the National Transmission System.
  • Enabling the transmission of gas flowing from the LNG Terminal in Świnoujście and the Baltic Pipe gas pipeline towards central and eastern Poland.
  • Increased capacity of the North-South Corridor (Goleniów-Odolanów trunk line).
  • Improved flexibility of the NTS in the event of emergencies.

Investment value:
Total project value – PLN 892,015,830.49
Contribution from European Funds – PLN 559,863,489.91

#EUFunds #EuropeanFunds

Investment status: 
  • The procedure for selecting a contractor for the construction works is ongoing – the selection of the WRB is planned for the end of 2025.
  • The construction phase is planned for 2026-27.
  • The investment is planned to be completed in 2027.

Course and location of the investment:
The investment will be located in the village of Zębowo, Lwówek municipality, Wielkopolska Province, in the vicinity of the existing Lwówek Gas Hub.


Mapka Oświęcim-Tworzeń

Benefits

  • Utilizing the SGT infrastructure to strengthen the efficiency of the National Transmission System.
  • Enabling the transmission of gas flowing from the LNG Terminal in Swinoujscie and the Baltic Pipe pipeline towards central and eastern Poland.
  • Increasing the capacity of the North-South Corridor (Goleniow - Odolanów main line).
  • Improving the flexibility of the NTS in case of emergencies.

Administrative decisions

Decision establishing the location:
Decision on the location of the investment: it is planned to obtain the decision in January 2024.

Public consultations

The construction of the Lvov Gas Compressor Station was the subject of a meeting with residents, which we organized as part of the public consultation for this project. November 8, 2023 at the Village Hall in Zębowo. Detailed information about the consultations can be found on the poster.
 

Contacts to Contractors and Investor

Design Documentation Contractor:
PGNiG GAZOPROJEKT S.A.
ul. Strzegomska 55a
53-611 Wrocław
phone number. (71) 785 11 00
e-mail: sekretariat@gazoprojekt.pl

Investor:
Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A.
Oddział w Poznaniu
ul. Grobla 15
61-859 Poznań
phone number. +48 61 854 44 45
e-mail: komunikacja.poznan@gaz-system.pl