Integration of the NTS and SGT areas
From 1 January 2027 at 6:00 a.m., an integrated entry-exit system will operate in Poland. The changes concern the E-gas balancing area.
- GCP GAZ-SYSTEM/ONTRAS, EIC code: 21Z000000000456C,
- Mallnow, EIC code: 21Z000000000056S.
The establishment of the integrated entry-exit system will entail changes including the administration of Transmission Contracts, capacity allocations at the GCP GAZ-SYSTEM/ONTRAS and Mallnow interconnection points, capacity booking rules at the Poland–Germany interconnection, and the removal of the Interconnection Point (PWP).What do I need to do before 1 January 2027?

Do you have a Transmission Contract forming the basis for using the NTS?
From 1 January 2027, a single Transmission Contract will apply: the existing Transmission Contract forming the basis for using the NTS. No amendments are required to use VIP THE-PL. You do not need to conclude a new Transmission Contract or sign an annex.
Do you also have a Transmission Contract forming the basis for using SGT (TGPS)?
SGT (TGPS) will no longer operate as a separate gas entry-exit system. Therefore, the Transmission Contracts currently forming the basis for using SGT (TGPS) will need to be formally terminated. They will no longer be required to use the integrated entry-exit system. By November 2026, we will provide you with an agreement terminating that contract.
Do you wish to use capacity at the Poland–Germany interconnection?
All capacity at the Polish-German border will be offered at a single new point, VIP THE-PL. Prepare to use VIP THE-PL:
- To use capacity at this point, you must have a Transmission Contract with GAZ-SYSTEM and a transmission contract with ONTRAS Gastransport GmbH, which will operate the German side of VIP THE-PL.
- Capacity at the new point will be offered on the GSA Platform.
Do not postpone your preparations until January. The first monthly auction for VIP THE-PL listed in the auction schedule will start on 21 December 2026 at 9:00 a.m. It will concern a monthly product for the gas month starting on 1 January 2027 at 6:00 a.m.
What about the financial guarantees provided for the performance of SGT (TGPS) Transmission Contracts?
The reimbursement of deposits provided for the use of SGT (TGPS), or their transfer for the purpose of using the integrated entry-exit system, will be agreed in the agreements terminating the Transmission Contracts forming the basis for using SGT (TGPS). The rules governing financial guarantees for Transmission Contracts, as set out in the General Terms and Conditions attached to the Transmission Contract forming the basis for using the NTS, remain unchanged.
What will change regarding capacity allocations?
| Current point | Change from 1 January 2027 at 6:00 a.m. |
|---|---|
|
The capacity allocation will be terminated. |
|
The capacity allocations will be integrated and assigned to the new point at the Polish-German border: VIP THE-PL ID 102436 oraz ID 172436 |
How should I prepare to use VIP THE-PL?
1. Formalise your cooperation with GAZ-SYSTEM.
- If you have an active transmission contract for the National Transmission System (NTS) and the relevant power of attorney to participate in auctions, you are ready.
- If you do not have a contract with GAZ-SYSTEM – check the requirements for concluding a transmission contract and the requirements for booking capacity at interconnectors.
2. Arrange your cooperation with ONTRAS.
Check the requirements for concluding a contract and booking capacity on the German side.
3. Check the communication requirements specified by ONTRAS.
The operator states that booking capacity at VIP THE-PL requires, among other things, a successful communication test. See the full list of requirements on the operator’s website.
4. Check your access to the GSA Platform.
Capacity at VIP THE-PL will be offered on the GSA Platform.
- GSA Platform: home page.
- GSA Platform: registration, auction and document instructions.
Auctions in the transition period
| Auction start | Capacity product | Product duration | Interconnection point (auction platform) | TSO offering capacity on the German side |
|---|---|---|---|---|
| 21.12.2026, 9:00 a.m. |
Monthly (firm) | 01.01.2027 (6:00 a.m.) – 01.02.2027 (6:00 a.m.) |
VIP THE-PL (GSA Platform) |
ONTRAS |
| 30.12.2026, 4:30 a.m. |
Daily (firm) | 31.12.2026 (6:00 a.m.) – 01.01.2027 (6:00 a.m.) |
GCP GAZ-SYSTEM/ONTRAS (RBP) /SGT Mallnow (GSA Platform) |
ONTRAS / GASCADE |
| 30.12.2026, 7:00 p.m. |
Within-day (firm) | 31.12.2026 (6:00 a.m.) – 01.01.2027 (6:00 a.m.) |
GCP GAZ-SYSTEM/ONTRAS (RBP) /SGT Mallnow (GSA Platform) |
ONTRAS / GASCADE |
| 31.12.2026, 4:30 p.m. |
Daily (firm) | 01.01.2027 (6:00 a.m.) – 02.01.2027 (6:00 a.m.) |
VIP THE-PL (GSA Platform) |
ONTRAS |
| 31.12.2026, 7:00 p.m. |
Within-day (firm) | 01.01.2027 (6:00 a.m.) – 02.01.2027 (6:00 a.m.) |
VIP THE-PL (GSA Platform) |
ONTRAS |
| All subsequent auctions for VIP THE-PL will be held on the GSA Platform. | ||||
Go to the auctions on the GSA Platform.
Where can I find the relevant documents valid from 1 January?
- NTS Transmission Network Code. (PDF, 1.5 MB)
- See Tariff No. 1/2027. (PDF, 0.7 MB)
- GAZ-SYSTEM fee calculator for gaseous fuel transmission services based on long-term contracts for 2027.
- GAZ-SYSTEM fee calculator for gaseous fuel transmission services based on short-term contracts for 2027.
- List of relevant points NTS (PL). (PDF, 92.7 KB)
Who can I contact?
Transmission Contracts, PP/PZ and financial guarantees:
Transmission Contracts Department. E-mail: dzialumowprzesylowych@gaz-system.pl.
Using the Information Exchange System (IES):
Customer Service Systems Department. E-mail: klient@gaz-system.pl.Using the GSA Platform:
GSA Platform Team. gsa@gsaplatform.eu.See the presentation on changes to Transmission Contracts from 1 January 2027 (PDF, 0.7 MB)
Questions and answers about GAZ-SYSTEM services.