From 1 January 2027 at 6:00 a.m., an integrated entry-exit system will operate in Poland. The changes concern the E-gas balancing area.
At the same time, a single virtual interconnection point, VIP THE-PL (EIC: 21Z0000000005487), will be launched at the Polish-German border. The point will be formed by combining the existing interconnection points:
  • GCP GAZ-SYSTEM/ONTRAS, EIC code: 21Z000000000456C,
  • Mallnow, EIC code: 21Z000000000056S.
VIP THE-PL will connect the German Trading Hub Europe market area with the integrated Polish entry-exit system.
 
The establishment of the integrated entry-exit system will entail changes including the administration of Transmission Contracts, capacity allocations at the GCP GAZ-SYSTEM/ONTRAS and Mallnow interconnection points, capacity booking rules at the Poland–Germany interconnection, and the removal of the Interconnection Point (PWP).

What do I need to do before 1 January 2027?


Do you have a Transmission Contract forming the basis for using the NTS?

From 1 January 2027, a single Transmission Contract will apply: the existing Transmission Contract forming the basis for using the NTS. No amendments are required to use VIP THE-PL. You do not need to conclude a new Transmission Contract or sign an annex.

Do you also have a Transmission Contract forming the basis for using SGT (TGPS)?

SGT (TGPS) will no longer operate as a separate gas entry-exit system. Therefore, the Transmission Contracts currently forming the basis for using SGT (TGPS) will need to be formally terminated. They will no longer be required to use the integrated entry-exit system. By November 2026, we will provide you with an agreement terminating that contract.

Do you wish to use capacity at the Poland–Germany interconnection?

All capacity at the Polish-German border will be offered at a single new point, VIP THE-PL. Prepare to use VIP THE-PL:

  • To use capacity at this point, you must have a Transmission Contract with GAZ-SYSTEM and a transmission contract with ONTRAS Gastransport GmbH, which will operate the German side of VIP THE-PL.
  • Capacity at the new point will be offered on the GSA Platform.


Do not postpone your preparations until January. The first monthly auction for VIP THE-PL listed in the auction schedule will start on 21 December 2026 at 9:00 a.m. It will concern a monthly product for the gas month starting on 1 January 2027 at 6:00 a.m.

What about the financial guarantees provided for the performance of SGT (TGPS) Transmission Contracts?

The reimbursement of deposits provided for the use of SGT (TGPS), or their transfer for the purpose of using the integrated entry-exit system, will be agreed in the agreements terminating the Transmission Contracts forming the basis for using SGT (TGPS). The rules governing financial guarantees for Transmission Contracts, as set out in the General Terms and Conditions attached to the Transmission Contract forming the basis for using the NTS, remain unchanged.

What will change regarding capacity allocations?

The changes will affect capacity allocations at the PWP, SGT PWP, SGT Mallnow and GCP GAZ-SYSTEM/ONTRAS interconnection points.
 
What will change regarding capacity allocations?
Current point Change from 1 January 2027 at 6:00 a.m.
  • SGT Interconnection Point ID 800034 and ID 870034
  • Interconnection Point ID 102434 and ID 172434
The capacity allocation will be terminated.
  • Mallnow ID 800002 and ID 870002, connecting the Transit Gas Pipeline System with the natural gas transmission system operated by GASCADE Gastransport GmbH
  • GCP GAZ-SYSTEM/ONTRAS ID 102435 and ID 172435, connecting the Polish National Gas Transmission System with the natural gas transmission system operated by ONTRAS Gastransport GmbH
The capacity allocations will be integrated and assigned to the new point at the Polish-German border: VIP THE-PL ID 102436 oraz ID 172436 
These changes are based on the provisions of the new Transmission Network Code.

How should I prepare to use VIP THE-PL?

1. Formalise your cooperation with GAZ-SYSTEM.


2. Arrange your cooperation with ONTRAS.

Check the requirements for concluding a contract and booking capacity on the German side.
 

3. Check the communication requirements specified by ONTRAS.

The operator states that booking capacity at VIP THE-PL requires, among other things, a successful communication test. See the full list of requirements on the operator’s website.

4. Check your access to the GSA Platform.
Capacity at VIP THE-PL will be offered on the GSA Platform.

Auctions in the transition period

Information on the first capacity auctions at VIP THE-PL and the last auctions at the GCP GAZ-SYSTEM/ONTRAS and SGT Mallnow interconnection points:
 
Auction dates for VIP THE-PL
Auction start Capacity product Product duration Interconnection point (auction platform) TSO offering capacity on the German side
21.12.2026,
9:00 a.m.
Monthly (firm) 01.01.2027 (6:00 a.m.) –
01.02.2027 (6:00 a.m.)
VIP THE-PL
(GSA Platform)
ONTRAS
30.12.2026,
4:30 a.m.
Daily (firm) 31.12.2026 (6:00 a.m.) –
01.01.2027 (6:00 a.m.)
GCP GAZ-SYSTEM/ONTRAS (RBP)
/SGT Mallnow (GSA Platform)
ONTRAS /
GASCADE
30.12.2026,
7:00 p.m.
Within-day (firm) 31.12.2026 (6:00 a.m.) –
01.01.2027 (6:00 a.m.)
GCP GAZ-SYSTEM/ONTRAS (RBP)
/SGT Mallnow (GSA Platform)
ONTRAS /
GASCADE
31.12.2026,
4:30 p.m.
Daily (firm) 01.01.2027 (6:00 a.m.) –
02.01.2027 (6:00 a.m.)
VIP THE-PL
(GSA Platform)
ONTRAS
31.12.2026,
7:00 p.m.
Within-day (firm) 01.01.2027 (6:00 a.m.) –
02.01.2027 (6:00 a.m.)
VIP THE-PL
(GSA Platform)
ONTRAS
All subsequent auctions for VIP THE-PL will be held on the GSA Platform.
Please note that the final within-day auction for the Gas Day of 31 December 2026 (product duration: 1 January 2027, 5:00–6:00 a.m.) will be the last auction for the GCP GAZ-SYSTEM/ONTRAS and SGT Mallnow interconnection points.

Go to the auctions on the GSA Platform.

Who can I contact?

Transmission Contracts, PP/PZ and financial guarantees:

Transmission Contracts Department. E-mail: dzialumowprzesylowych@gaz-system.pl.


Using the Information Exchange System (IES):

Customer Service Systems Department. E-mail: klient@gaz-system.pl.
 

Using the GSA Platform:

GSA Platform Team. gsa@gsaplatform.eu.

See the presentation on changes to Transmission Contracts from 1 January 2027 (PDF, 0.7 MB)

Questions and answers about GAZ-SYSTEM services.