Rozwadów – Strachocina
Basic parameters and description of the project:
Project status:
Project route and location:
The gas pipeline will be located in the Podkarpackie Province. Its route will run through the municipalities of Radomyśl nad Sanem, Pysznica, Nisko, Rudnik nad Sanem, Jeżowe, Nowa Sarzyna, Leżajsk, Żołynia, Białobrzegi, Łańcut, Markowa, Jawornik Polski, Hyżne, Dynów, Błażowa, Nozdrzec, Brzozów, Dydnia and Sanok.
- high pressure gas pipeline,
- diameter: 1000 mm,
- working pressure: 8,4 MPa,
- length: approx. 162 km
Project status:
- pipeline under design
Project route and location:
The gas pipeline will be located in the Podkarpackie Province. Its route will run through the municipalities of Radomyśl nad Sanem, Pysznica, Nisko, Rudnik nad Sanem, Jeżowe, Nowa Sarzyna, Leżajsk, Żołynia, Białobrzegi, Łańcut, Markowa, Jawornik Polski, Hyżne, Dynów, Błażowa, Nozdrzec, Brzozów, Dydnia and Sanok.
Benefits
The gas pipeline is part of the Central – East Corridor investment programme. Together with the planned Wronów-Rozwadów gas pipeline and the already constructed Gustorzyn-Wronów connection, it will constitute the main transmission artery in central and southern Poland eastern Poland, creating a two-way gas transport route from Lithuania, through Poland to Slovakia, and in the future also reaching Ukraine. It will also enable the transmission of gas supplied through the planned FSRU terminal in Gdańsk. This will optimise the operation of the transmission system and ensure security of supply.
The investment is part of the energy transition concept through the development of the domestic natural gas market and increasing the possibilities of connecting industrial customers, including energy and heat producers, to the network.
An important benefit for the local community will be the property tax paid annually by GAZ-SYSTEM, amounting to up to 2% of the value of the transmission infrastructure built in a given municipality. This will be a regular contribution to the budget, which can be allocated to the needs of local communities.
The investment is part of the energy transition concept through the development of the domestic natural gas market and increasing the possibilities of connecting industrial customers, including energy and heat producers, to the network.
An important benefit for the local community will be the property tax paid annually by GAZ-SYSTEM, amounting to up to 2% of the value of the transmission infrastructure built in a given municipality. This will be a regular contribution to the budget, which can be allocated to the needs of local communities.
Legal basis
The project is implemented on the basis of the provisions of the Act of 24 April 2009 on investments in regasification terminal for liquefied natural gas in Świnoujście (for consolidated text see Journal of Laws of 2024, item 1286).
Administrative decisions
Decision on environmental conditions
On 23 June 2025, the Regional Director for Environmental Protection in Rzeszów issued decision ref. no.: WOOŚ.420.1.1.2024. PW.75 on environmental conditions for the project entitled: ‘Construction of a DN1000 MOP 8.4 MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation. Section II: Głuchów – Strachocina’.
On 18 July 2025, the Regional Director for Environmental Protection in Rzeszów issued decision ref. no.: WOOŚ.420.20.2.2024. BL.92 on the environmental conditions for the project entitled: ‘Construction of a DN1000 MOP 8.4 MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation. Section I: Rozwadów – Głuchów’.
Decision on determining the location
On 9 October 2025, the Podkarpackie Province Governor issued decision no. 1/15/25 on determining the location of an investment accompanying the investment in a liquefied natural gas regasification terminal in Świnoujście, under the name: ‘Construction of a high-pressure gas pipeline DN 1000 MOP 8.4 MPa Rozwadów – Strachocina, together with the infrastructure necessary for its operation.’ Section I Rozwadów – Głuchów, as part of investments accompanying investments in the terminal: Construction of the Rembelszczyzna – Wronów – Rozwadów – Strachocina gas pipeline, together with the infrastructure necessary for its operation in the Mazowieckie, Lubelskie and Podkarpackie provinces.
On 25 September 2025, the Podkarpackie Province Governor issued decision no. 14/25 on determining the location of an investment accompanying the investment in the liquefied gas regasification terminal in Świnoujście for the investment project entitled: ‘Construction of a high-pressure gas pipeline DN 1000 MOP 8.4 MPa Rozwadów – Strachocina, together with the infrastructure necessary for its operation.’ Głuchów Gas Hub. As part of the investment accompanying the terminal investments: Construction of the Rembelszczyzna – Wronów – Rozwadów – Strachocina gas pipeline, together with the infrastructure necessary for its operation in the Mazowieckie, Lubelskie and Podkarpackie provinces.
On 15 September 2025, the Podkarpackie Province Governor issued decision no. 1/13/25 on determining the location of an investment accompanying the investment in a liquefied natural gas regasification terminal in Świnoujście, under the name: "Construction of a high-pressure gas pipeline DN 1000 MOP 8.4 MPa Rozwadów – Strachocina, together with the infrastructure necessary for its operation. Section II Głuchów – Strachocina, as part of an investment accompanying investments in the terminal: Construction of a gas pipeline Rembelszczyzna – Wronów – Rozwadów – Strachocina, together with the infrastructure necessary for its operation in the provinces of Mazovia, Lublin and Podkarpacie."
Decision on the construction permit:
On 23 February 2026, the Podkarpackie Province Governor issued Decision No. 3/2026, ref. no.: I-XI.7840.2.5.2025, approving the land-use plan and the architectural and construction design, and granted a building permit for the construction project entitled: “Construction of a DN1000 MOP 8.4MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation” Section I: Rozwadów – Głuchów. As part of the project: “Construction of the Rembelszczyzna–Wronów–Rozwadów–Strachocina gas pipeline, together with the infrastructure necessary for its operation, within the provinces of Mazovia, Lublin and Subcarpathia”.
On 23 December 2025, the Podkarpackie Province Governor issued Decision No. 13/2025, ref. no.: I-XIII.7840.1.12.2025, approving the land-use plan and the architectural and construction design, and granted a building permit for the construction project entitled: “Construction of a DN1000 MOP 8.4MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation”. Section II: Głuchów – Strachocina. As part of the project: “Construction of the Rembelszczyzna-Wronów-Rozwadów-Strachocina gas pipeline, together with the infrastructure necessary for its operation, within the provinces of Mazovia, Lublin and Subcarpathia”.
On 23 June 2025, the Regional Director for Environmental Protection in Rzeszów issued decision ref. no.: WOOŚ.420.1.1.2024. PW.75 on environmental conditions for the project entitled: ‘Construction of a DN1000 MOP 8.4 MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation. Section II: Głuchów – Strachocina’.
On 18 July 2025, the Regional Director for Environmental Protection in Rzeszów issued decision ref. no.: WOOŚ.420.20.2.2024. BL.92 on the environmental conditions for the project entitled: ‘Construction of a DN1000 MOP 8.4 MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation. Section I: Rozwadów – Głuchów’.
Decision on determining the location
On 9 October 2025, the Podkarpackie Province Governor issued decision no. 1/15/25 on determining the location of an investment accompanying the investment in a liquefied natural gas regasification terminal in Świnoujście, under the name: ‘Construction of a high-pressure gas pipeline DN 1000 MOP 8.4 MPa Rozwadów – Strachocina, together with the infrastructure necessary for its operation.’ Section I Rozwadów – Głuchów, as part of investments accompanying investments in the terminal: Construction of the Rembelszczyzna – Wronów – Rozwadów – Strachocina gas pipeline, together with the infrastructure necessary for its operation in the Mazowieckie, Lubelskie and Podkarpackie provinces.
On 25 September 2025, the Podkarpackie Province Governor issued decision no. 14/25 on determining the location of an investment accompanying the investment in the liquefied gas regasification terminal in Świnoujście for the investment project entitled: ‘Construction of a high-pressure gas pipeline DN 1000 MOP 8.4 MPa Rozwadów – Strachocina, together with the infrastructure necessary for its operation.’ Głuchów Gas Hub. As part of the investment accompanying the terminal investments: Construction of the Rembelszczyzna – Wronów – Rozwadów – Strachocina gas pipeline, together with the infrastructure necessary for its operation in the Mazowieckie, Lubelskie and Podkarpackie provinces.
On 15 September 2025, the Podkarpackie Province Governor issued decision no. 1/13/25 on determining the location of an investment accompanying the investment in a liquefied natural gas regasification terminal in Świnoujście, under the name: "Construction of a high-pressure gas pipeline DN 1000 MOP 8.4 MPa Rozwadów – Strachocina, together with the infrastructure necessary for its operation. Section II Głuchów – Strachocina, as part of an investment accompanying investments in the terminal: Construction of a gas pipeline Rembelszczyzna – Wronów – Rozwadów – Strachocina, together with the infrastructure necessary for its operation in the provinces of Mazovia, Lublin and Podkarpacie."
Decision on the construction permit:
On 23 February 2026, the Podkarpackie Province Governor issued Decision No. 3/2026, ref. no.: I-XI.7840.2.5.2025, approving the land-use plan and the architectural and construction design, and granted a building permit for the construction project entitled: “Construction of a DN1000 MOP 8.4MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation” Section I: Rozwadów – Głuchów. As part of the project: “Construction of the Rembelszczyzna–Wronów–Rozwadów–Strachocina gas pipeline, together with the infrastructure necessary for its operation, within the provinces of Mazovia, Lublin and Subcarpathia”.
On 23 December 2025, the Podkarpackie Province Governor issued Decision No. 13/2025, ref. no.: I-XIII.7840.1.12.2025, approving the land-use plan and the architectural and construction design, and granted a building permit for the construction project entitled: “Construction of a DN1000 MOP 8.4MPa gas pipeline between Rozwadów and Strachocina, together with the infrastructure necessary for its operation”. Section II: Głuchów – Strachocina. As part of the project: “Construction of the Rembelszczyzna-Wronów-Rozwadów-Strachocina gas pipeline, together with the infrastructure necessary for its operation, within the provinces of Mazovia, Lublin and Subcarpathia”.
Public consultations
GAZ-SYSTEM is holding information and consultation meetings for property owners who are located in the area of the planned project:
| Date | Place of consultation | Commune | Precinct | Detailed information about the consultation |
03.06.2024 12:00 - 17: 00 |
Remiza OSP w Futomie 36-030 Futoma 18 |
Błażowa | Futoma | Invitation and regulations for consultations |
04.06.22024 12:00 - 17: 00 |
Dom Strażaka 36-203 Izdebki 383A świetlica OSP (parter) |
Nozdrzec | Wesoła, Hłudno, Izdebki |
Invitation and regulations for consultations |
25.06.2024 12:00 - 17: 00 |
Dom Strażaka 36-067 Harta 144 |
Dynów | Harta, Ulanica, Wyręby, Łubno |
Invitation and regulations for consultations |
| 26.06.2024 12:00 - 17: 00 |
Urząd Gminy Hyżne 36-024 Hyżne 103 sala konferencyjna, IV piętro |
Hyżne | Grzegorzówka, Wólka Hyżneńska, Dylągówka, Szklary |
Invitation and regulations for consultations |
|
09.07.2024 |
Wiejski Dom Kultury, 37-455 Rzeczyca Długa 119 | Radomyśl nad Sanem | Rzeczyca Długa, Rzeczyca Okrągła, Dąbrowa Rzeczycka |
Invitation and regulations for consultations |
|
15.07.2024 |
Dom Kultury w Pysznicy, ul. Wolności 322, 37-403 Pysznica |
Pysznica | Jastkowice, Pysznica, Kłyżów |
Invitation and regulations for consultations |
|
16.07.2024 |
Centrum Kultury w Husowie, 37-121 Husów 1A | Markowa | Husów, Tarnawka |
Invitation and regulations for consultations |
| Jawornik Polski | Hadle Szklarskie | |||
|
17.07.2024 |
Wiejski Dom Kultury w Pakoszówce, 38-500 Pakoszówka 224 | Sanok | Jurowce, Lalin, Pakoszówka, Strachocina |
Invitation and regulations for consultations |
|
22.07.2024 |
Gminny Ośrodek Kultury w Żołyni, ul. Smolarska 1, 37-110 Żołynia | Żołynia | Brzóza Stadnicka, Żołynia |
Invitation and regulations for consultations |
| 23.07.2024 12:00 - 17:00 |
Gminny Ośrodek Kultury i Czytelnictwa w Białobrzegach, 37-114 Białobrzegi 1, sala nr 1 (parter) | Białobrzegi | Białobrzegi, Dębina, Korniaktów Południowy, |
Invitation and regulations for consultations |
| 10.09.2024 12:00 - 17:00 |
Urząd Gminy i Miasta Nisko, Plac Wolności 14, 37-400 Nisko, sala narad I piętro | Nisko | Kończyce Nisko Nowa Wieś Racławice Wolina Zarzecze |
Invitation and regulations for consultations |
| 11.09.2024 12:00 - 17:00 |
Urząd Gminy i Miasta w Rudniku nad Sanem, ul. Rynek 40, 37-420 Rudnik nad Sanem, sala posiedzeń (pokój nr 13, II piętro) | Rudnik nad Sanem | Przędzel Rudnik Stróża |
Invitation and regulations for consultations |
| Jeżowe | Groble | |||
| 12.09.2024 12:00 - 17:00 |
Urząd Miasta i Gminy w Nowej Sarzynie, ul. Mikołaja Kopernika 1, 37-310 Nowa Sarzyna, sala konferencyjna nr 204 | Nowa Sarzyna | Łętownia Sarzyna Wola Zarczycka |
Invitation and regulations for consultations |
| 24.09.2024 12:00 - 17:00 |
Dom Strażaka, Niebocko 150, 36-207 Niebocko | Dydnia | Dydnia Grabówka Jabłonka Niebocko |
Invitation and regulations for consultations |
| Brzozów | Przysietnica | |||
| 25.09.2024 12:00 - 17:00 |
Ośrodek Kultury w Soninie, Sonina 266, 37-100 Łańcut | Łańcut | Albigowa Głuchów Handzlówka Kosina Sonina Wysoka |
Invitation and regulations for consultations |
| 26.09.2024 12:00 - 17:00 |
Ośrodek Kultury w Biedaczowie, Biedaczów 83B, 37-110 Żołynia | Leżajsk | Biedaczów Brzóza Królewska Hucisko |
Invitation and regulations for consultations |
Consultations are conducted in the form of office hours and individual meetings with residents, without the need for prior registration.
During the meetings, interested parties can learn about the scope and schedule of the project, the route of the gas pipeline, and the compensation payment procedure, among other things.
Compensation payments
Under a special act regulating gas infrastructure projects, compensation payments are guaranteed to the owners of the land affected by the project development.
The compensation payment process is carried out in accordance with an administrative procedure, under the supervision of the competent Voivode. First, an independent expert is commissioned to carry out an assessment, which is the basis for determining the amount of compensation. Upon completion of the construction process, the Voivode issues an administrative decision specifying the amount of compensation due.
For more information about the compensation payments and construction process see the section For Landowners.
The compensation payment process is carried out in accordance with an administrative procedure, under the supervision of the competent Voivode. First, an independent expert is commissioned to carry out an assessment, which is the basis for determining the amount of compensation. Upon completion of the construction process, the Voivode issues an administrative decision specifying the amount of compensation due.
For more information about the compensation payments and construction process see the section For Landowners.
Contacts to Contractors and Investor
Design engineer:
ANTEA Polska S.A.
ul. Dulęby 5
40-833 Katowice
phone number: 32 358 88 88
e-mail: pl@anteagroup.pl
Investor:
Gas Transmission Operator GAZ-SYSTEM S.A.
Oddział w Tarnowie
Pogórska Wola 450
33-152 Pogórska Wola
phone number. 14 622 53 00
phone number. 605 552 407
e-mail: komunikacja.tarnow@gaz-system.pl
ANTEA Polska S.A.
ul. Dulęby 5
40-833 Katowice
phone number: 32 358 88 88
e-mail: pl@anteagroup.pl
Investor:
Gas Transmission Operator GAZ-SYSTEM S.A.
Oddział w Tarnowie
Pogórska Wola 450
33-152 Pogórska Wola
phone number. 14 622 53 00
phone number. 605 552 407
e-mail: komunikacja.tarnow@gaz-system.pl