Odolanów gas compressor station infrastructure
Project description:
  • capacity of the compressor station after the expansion – 30 MW, of which:
  • 30MW – Stage 1 (implementation phase), 20 MW – Stage 2 (engineering phase) capacity: min. 280,000 m3/h; max. 1,380,000 mm3/h
The investment was involved the expansion of the existing gas compressor station in Odolanów, the expansion of the transmission node in Odolanów and the connection of these elements with the existing transmission infrastructure.

Project schedule:
  • The investment has been completed.

Location:
Investment was located in Odolanów municipality, Wielkopolskie Voivodeship
Map of Goleniów-Lwówek and compressor stations

Benefits

The role of the new Odolanów gas compressor station is to provide incremental capacity of the transmission system by pumping additional volumes of gas from the Baltic Pipe offshore pipeline. It will strengthen Poland’s energy security and be a crucial link of the North-South Corridor.

The municipality where the compressor station was upgraded will benefit significantly from the taxes to be paid annually by GAZ-SYSTEM.

EU co-financing

The investment is co-financed by the European Union under the Connecting Europe Facility (CEF).

Project of Common Interest (PCI)

The European Commission has granted the PCI (Project of Common Interest) status to the project. More information on the significance of the PCI status for the development of gas transmission infrastructure can be found in the  dedicated section on PCI projects.

While implementing its investment projects GAZ-SYSTEM S.A. respects the rights of all interested parties. You are encouraged to send comments and questions concerning any project which was granted the PCI status using the Form for questions and comments concerning the implementation of projects with PCI status by GAZ- SYSTEM.

Administrative decisions

Location decision
On July 25, 2019, the Governor of Wielkopolskie Voivodeship issued a decision on the location of the Odolanów gas compressor station as a project associated with the LNG terminal project.

Building permit
On February 10, 2020, the Governor of Wielkopolskie Voivodeship issued a building permit for the Odolanów Gas Compressor Station.

Contacts to Contractors and Investor

Design engineer:
PGNiG GAZOPROJEKT S.A.
ul. Strzegomska 55a
53-611 Wrocław
phone number. (71) 785 11 00
e-mail: sekretariat@gazoprojekt.pl

Building Contractor:
Konsorcjum w składzie: ATREM S.A. (Lider), JT S.A., PJP MAKRUM S.A., PROJPRZEM Budownictwo Sp. z o.o.
Biuro Budowy
63-410 Odolanów
ul. Krotoszyńska 148

Investor’s Supervision Contractor:
SGS Polska Sp. z o.o.
ul. Ignacego Daszyńskiego 7
72-320 Trzebiatów
phone number. +48 691767469

Investor:
Gas Transmission System Operator GAZ-SYSTEM S.A.
Oddział w Poznaniu
ul. Grobla 15
61-859 Poznań
phone number. +48 61 854 45 03