Expansion of the Polish gas transmission system
Basic parameters and description:
GAZ-SYSTEM, which owns the infrastructure, was responsible for its design, construction and now operation.
- Estimated pipeline length: approx. 230-280 km
- Pipeline diameters: 900 and 1000 mm
- Working pressure: 8.4 and 15 MPa
- Gas compressor stations: 3
GAZ-SYSTEM, which owns the infrastructure, was responsible for its design, construction and now operation.