Data in graphics

Pursuant to the Transmission Network Code of the NTS, the detailed terms and conditions and methods of cooperation with the entity operating the installation connected at the physical entry point from the domestic source are set out in a separate agreement and in technical annexes to the connection agreement.

GAZ-SYSTEM concludes such agreements on the basis of general model documents.

Documents for download

Agreement specifying detailed terms and conditions of cooperation with an entity operating a biomethane generation facility connected to the transmission system at a physical entry point from a domestic source (PL).